Blog

Dholera Smart City Completion Date & Development Timeline 2025–2040

Dholera Smart City - India’s first and largest Greenfield Smart City is turning the government’s vision of futuristic, self-sustaining urban development into reality. Located in the Dholera Special Investment Region (Dholera SIR) of Gujarat, it is part of the Delhi–Mumbai Industrial Corridor (DMIC) and aims to be a global hub for innovation, clean energy, and next-generation manufacturing.

Let’s explore how far the city has come and what lies ahead in its journey toward full completion.

The Vision for Dholera Smart City

The idea behind Dholera was simple yet powerful to build India’s first future-ready smart city from scratch. It’s designed to host advanced manufacturing industries like semiconductors, EVs, renewable energy, and aerospace, supported by state-of-the-art digital infrastructure.

Dholera’s master plan covers 920 sq. km, divided into industrial, residential, and recreational zones - all interconnected through smart technology, clean energy, and efficient transport networks.

The Building Blocks: Dholera’s Key Infrastructure

Before diving into the completion timeline, it’s important to note some core components already shaping Dholera Smart City Progress:

  • ABCD Building (Administrative & Control Hub) – The city’s digital command center monitoring utilities, traffic, lighting, and security.
  • Ahmedabad–Dholera Expressway – A high-speed corridor reducing travel time from Ahmedabad to just 45 minutes.
  • Dholera International Airport – Under construction, with first flights expected in 2026.
  • Dholera Solar Park – One of India’s largest renewable energy projects with a 5 GW capacity.
  • Tata Power & Jabil India Units – Flagship industrial setups powering clean tech and semiconductor manufacturing.
  • Activation Area (22.5 sq. km) – The pilot zone where all core utilities, roads, and systems are already functional.

Current Progress Snapshot (as of 2025)

According to DICDL, over 95% of the Activation Area infrastructure is complete, and industrial allotments have been made to companies like Tata Power Solar, ReNew Power, Hitachi Hi-Rel, and Torrent Gas.

Key systems such as underground networks, power grids, water supply from Narmada, and command & control operations are live. Meanwhile, large-scale housing and industrial expansion are set to begin post-2025, marking the city’s next big leap.

When Will Dholera Be Fully Functional?

Dholera Smart City’s evolution is strategically divided into three major phases, gradually shaping it into a global model of urban innovation.

Phase 1: 2020–2025 - Activation Area (22.5 sq. km)

This phase established Dholera’s backbone 75-meter-wide roads with underground utilities, sub-stations by Tata Power and Torrent Power, and a 250 MW Solar Park powering the grid. The ABCD Building (Command & Control Centre) is live, managing smart traffic, lighting, and flood systems.

DICDL’s 2024 report confirms 95% completion, with firms like Tata Power Solar, ReNew Power, and Hitachi Hi-Rel already allotted plots. Thanks to the Anchor Tenant Policy, industries enjoy GST refunds, 100% FDI, and ready infrastructure.

Status: Fully operational, the core of Dholera SIR is now active

Phase 2: 2025–2030 - Airport & Industrial Expansion

This phase positions Dholera on the global map. The Dholera International Airport, developed by AAI and the Gujarat Government, will complete Phase 1 construction by December 2025, with first flights expected in 2026.

Parallelly, the city is becoming India’s Semiconductor Manufacturing Hub, with Tata Electronics, ReNew, and others investing in clean-tech industries. The Ahmedabad–Dholera Expressway is complete, metro work begins by 2028, and residential projects will start post-2026.

Status: By 2030, Dholera will have a live airport, industrial zones, and operational expressway ready for large-scale habitation.

Phase 3: 2030–2042 - The Complete Smart City

Covering the full 920 sq. km, this phase will make Dholera a self-sustaining Greenfield Smart City.The population is projected to cross 1 million, with 8 lakh jobs across smart industries, education, and tourism.

Renewable power from the Dholera Solar Park will exceed 1000 MW, and AI-based systems will manage utilities citywide. From metro connectivity to high-tech universities, R&D centers, and green tourism corridors Dholera will redefine modern living.

Status: By 2042, Dholera Smart City will be fully functional, zero-carbon, and globally connected.

The foundation is ready, progress is visible, and the future is unfolding - Dholera Smart City: India’s Future Is Now Under Construction.

What’s Next for India’s Smart City Dream

With projects like the Dholera International Airport, Semiconductor Manufacturing India, and the Dholera Solar Park driving industrial demand, real estate in Dholera plots is already seeing steady growth.

As infrastructure expands and connectivity strengthens through the Ahmedabad Dholera Expressway, the region is rapidly emerging as India’s most promising investment and innovation corridor.

Conclusion

From a barren landscape to a living, breathing smart ecosystem, Dholera’s transformation is one of India’s most ambitious success stories in progress. By 2042, this city will not just be complete; it will be a symbol of how technology, sustainability, and planning can redefine urban India.